|
LEGAL NOTICE CITY OF LIMA, OHIO ALL-LIMA SPENCERVILLE ROAD SIDEWALKS Project No. 3-22ODOT PID No. 110277 Bids will be received in a sealed envelope, marked “SPENCERVILLE ROAD SIDEWALKS” to the Auditor of the City of Lima, attention Purchasing Department of the City of Lima, Ohio, Municipal Center, 50 Town Square, Lima, Ohio 45801, until 10:00 o’clock a.m., Lima Time, on Wednesday, July 13th, 2022. Purchasing Department is located on the 3rd floor of the Municipal Building, 50 Town Square. Outside of the envelope not being properly marked may result in bid not being received by the Purchasing Department before the deadline and could result in bid being disqualified. Bids will then be opened and read aloud for: THE IMPROVEMENTS ALONG CABLE ROAD, SPRENCERVILLE ROAD, AND NORTH SHORE DRIVE BY THE INSTALLATION OF SIDEWALK WITHIN THE RIGHT OF WAY. This work shall be performed by an ODOT pre-qualified Contractor in accordance with plans and specifications available in the Engineering office 50 Town Square, Lima, OH 45801 (Phone 419-221-5288), and copies thereof may be obtained at $30.00 for the plans and General Provisions (not refundable). The check shall be made payable to The City of Lima, Ohio. _______________________ Sharetta Smith, Mayor Three Publications: Friday June 17th, 2022 Friday June 24th, 2022 Friday July 1st, 2022
|
|
6/17/2022 12:00 AM
|
|
Published in the Lima News June 17th, June 24th and July 1st, 2022
|
|
7/13/2022 10:00 AM
|
|
Bids to be submitted to the Purchasing Office prior to 10:00AM July 13, 2022
|
|
Wed., July 13, 2022 10:00AM
|
|
7/6/2022
|
|
Ross Vennekotter 419-998-5522
|
|
30.00
|
|
City of Lima Municipal Center Public Works/Engineering 50 Town Square Lima, Ohio 45805 419-998-5525 (Ashley Blake)
|
|
8-4:30
|
|
This bid is accompanied by a proposal bond for one hundred percent (100%) of the total amount of the proposal with corporate surety satisfactory to the City, or by a certified check on a solvent bank, made payable to the City of Lima, Ohio, in the amount of ten percent (10%) of the total amount of the proposal.
|
|
Outside of the envelope not being properly marked may result in bid not being received by the Purchasing Department before the deadline and could result in bid being disqualified.
|
|
|
|